|
 |
|
 |
|
The Project
You
can almost feel the tension and the enthusiasm when the delegates
delicately set out the dominos. With only a limited amount of time
available they have to create a domino cascade. Just as in any project,
different teams work on sections of the cascade pattern. There are
countless challenges to be met and specific requirements to be
fulfilled in the process. |
|
|
How It’s Done
After
the starting shot, the group begins to work feverishly. Coordinated by
‘facilitators’, they concentrate on developing solutions for the
various construction challenges. Again and again you hear: “Oh no, not
again” when someone accidentally knocks over a domino and, in a split
second, demolishes a part of the painstakingly constructed domino line.
Only the built-in “Emergency Stop” – remove two of the domino from the
chain – interrupts the premature chain reaction. Finally everything is
ready, the interfaces and crossovers between the various sections of
the cascade are checked. Everything is ready for the release of the
chain reaction. At least three quarters of the domino must fall. To
achieve this, the teams have to develop a feeling for the correct
distance between the domino and, in various test phases, to get to
grips with the operational reliability of the twists and turns,
crossover points, height differences and other challenges. The
“facilitators” ensure a smooth flow of communication between the
sub-teams and repeatedly invite the whole group to up their motivation
by performing self-developed team rituals.
Delegates (min / opt / max): 5 / 15 / 30
Time for 5 – 15 delegates (w/o debriefing): 45 – 60 minutes
Space requirements: Seminar room or outdoor setting with at least 25 m2. Optimum is 50 – 100 m2.
|
|
|
Topics and Outcomes
Working in teams: jointly developing creative solutions, communication interchange, using team rituals.
Project management: making synergy effects tangible, coordination of
sub-teams, lines of communication in projects.
Organisational development: Working with CIP – Continual Improvement
Process, working with limited resources.
Leadership training: coordination of sub-teams, management of a larger system.
Contents of basic set for up to 30 delegates: 750 dominoes in 5 colors
(white, yellow, blue, green, red) and in 5 separate cotton bags, 1
detailed instructions manual. Shipped in wooden case.
Weight: 11 kg.
Order no. 1810 / Price US$ 567,00
|
|
 |
|